Borouge 4 began production, increasing the company's total annual polyolefin capacity to 6.4 million tonnes, including a 1.4 million tonne capacity addition scheduled for full operation by Q4 2026.
The company achieved its 2025 RESP targets, recording a 30.4% reduction in energy intensity (target 28%), a 27% reduction in Scope 1 emissions (target 22%), and a 36% reduction in Scope 2 emissions (target 19%).
AI-driven operational initiatives delivered $715 million in value, surpassing the $575 million target, and supported the Borouge 3 plant turnaround which was